Reports have a 'none to many' relationship with a record. Because of this, reports are useful for collecting information about deviations. It is recommended that the add a report button is utilized and dependencies are created where a deviation may occur.


Using the add a report button, the Protocol Deviation report will always be linked to the phase in which the report was created.



Check if a deviation was added

You can check to see if a deviation was added to a report by either of the following methods:

1. Check if a report was added

2. Creating Notifications on the Report Event type and choosing the Deviation Report.